TTT Inc. Holding Group ESCO PROJECT QUESTIONNAIRE Facility Name: Facility President/Managing Director: Facility Technical Director: Phone: Fax: E-mail: Website: PLEASE PROVIDE AS DETAILED INFORMATION AS POSSIBLE: 1) Schematic Diagram of the layout of your facility, including location of all Energy/Environment/Automation systems with detailed dimensions. 2) Weekly or Monthly Summary of Energy and Steam/Hot Water Consumption for the past 3 years. 3) The cost you pay for: - Externally generated Electricity - Natural Gas - Fuel Oil - Coal - Other Fuel 4) Are partial/complete Facility Energy Audit reports available for review? If yes, please provide a copy of the most current one/ones. 5) Data on your existing: a) Boilers if any: - Number of units: - Type: - Power Rating: - Fuel Source: - BTU in at 100% Load: - BTU out at 100% Load: - BTU in at 75% Load: - BTU out at 75% Load: - BTU in at 50% Load: - BTU out at 50% Load: - BTU in at 25% Load: - BTU out at 25% Load: - Number of hours a day in use: b) (Micro) Turbines if any: - Number of units: - Type: - Power Rating: - Actual Operating Efficiency and Calculation Method Used: - Number of hours a day in use: c) Chillers if any: - Number of units: - Type: - Power Rating: - Actual Operating Efficiency and Calculation Method Used: - Number of hours a day in use: d) Heat Exchangers if any: - Number of units: - Type: - Power Rating: - Actual Operating Efficiency and Calculation Method Used: - Number of hours a day in use: e) Condensers if any: - Number of units: - Type: - Power Rating: - Actual Operating Efficiency and Calculation Method Used: - Number of hours a day in use: f) Absorbers if any: - Number of units: - Type: - Power Rating: - Actual Operating Efficiency and Calculation Method Used: - Number of hours a day in use: g) Thermal Storage Tank if any - Number of units: - Type: - Storage Capacity: - Actual Operating Efficiency and Calculation Method Used: - Number of hours a day in use: h) Diesel or other Generating Set/Engine if any: - Number of units: - Type: - Power Rating: - Actual Operating Efficiency and Calculation Method Used: - Number of hours a day in use: i) Fuel Cells if any: - Number of units: - Type: - Power Rating: - Actual Operating Efficiency and Calculation Method Used: - Number of hours a day in use: j) Heating/Ventilating/Air Conditioning Systems if any - Number of units: - Type: - Actual Operating Efficiency and Calculation Method Used: k) Other Systems if any: - Type: - Actual Operating Efficiency: 6) In your Facilities Department, as it pertains to operation/maintenance of Energy/Environmental Systems, how many of your staff are: - Engineers: Additional certifications/training: - Technicians: Additional certifications/training: 7) In your Facilities Department, which of the Energy Systems listed in question 5 are connected via Internal Local Area Network to a real-time Computer Monitoring System? 8) If considering ON-SITE COGENERATION at your facility, are there any CONSTRAINTS/LIMITATIONS we should be aware of: a) Right to re-sell extra power? b) Right to back-up/maintenance power from the public electricity grid in case of system shutdown/overload? c) Feasibility study undertaken for pending project? d) Construction/Installation issues (boiler house size restrictions on height, area)? e) Fuel supply options and Price Arbitrage options? f) Insurance Issues? g) Combustion Cycles required: - Topping/bottoming: - Heat balance: - Repowering: - Combined-cycle: - Baseload: - Peak-shaving: - Thermal-tracking: h) Local Permits? i) Interconnection with the public electric grid: - safety/line protection? - inspection/testing program? j) Environmental considerations: - air emissions control? - water requirements? - waste disposal? - other?